The Distrito La Perseverancia project required a waterproofing system that met the highest technical and formal standards. The challenge was to cover more than 27,000 m² across different work fronts while ensuring quality, continuity, and coordination with other construction disciplines.
Design of specific waterproofing packages by sector.
Operational coordination with subsequent trades in critical areas.
Interventions in landscaped areas up to 3 meters deep.
Continuous technical supervision at every stage of execution.
As a result, 27,000 m² have already been waterproofed, including 10,000 m² in the elevated park on the third floor and 6,000 m² on the ground floor. The project, which has been underway for the past eight months, is on schedule and sets a new standard of work that combines technical rigor, operational efficiency, and measurable results.